The new production line will be officially put into operation in 2019

Tianhecheng's new production line was officially completed on July 1, 2018 and officially put into operation in November 2019. The new production line has a total construction area of 2,800 square meters, of which the production room covers an area of 1,600 square meters. The first floor is a 100,000-level purification workshop, and the whole production process is set up to visit the channel. The layout and structure are strictly in accordance with GMP standards, which can effectively prevent cross-contamination; the second and third floors are power workshops, and the equipment that comes into contact with materials is made of 304 stainless steel or 316 stainless steel, which effectively ensures the safety and reliability of the product.

  • 2800

    Total construction area of the new production line

  • 1600

    Production workshop area

  • 100000

    100,000-level purification plant

  • GMP

    Standard requirements